Changelog¶
Version 0.0.6¶
Add
--ignore-label
option #3Add shortcuts
-u
and-t
for gitlab url and gitlab tokenFix Bug that percentage done was not calculated correctly #5
Syncing always set Task Type to Fixed Work but revert to original after sync #6
Adding parameter
--force-fixed-work
that does not reset the Task Type after syncDo not sync work with summary task #1
Version 0.0.5¶
was only required to get travis to work, now it does!
Version 0.0.4¶
- First auto release with travis
Use Travis AWS
Use travis.com instead of travis.org
Version 0.0.3¶
Also use Hyperlink or Text29 URL field to find related issues
Added documentation on how to fix the OpenURL Problem
Fixed some sync bugs
Version 0.0.2¶
- Documentation Only Changes
Add Badges
Import Readme to documentation
Allow build of documentation even without pywin32 installed
Use ReadTheDoc Sphinx Theme
Version 0.0.1¶
First Release